5 June 2026

Windows & doors in two, roofs on other two, awaiting windows to arrive & bricks arrive next week.

1 May 2026

Plywood bracing & iron on roofs for two, framing up for the next two.

27 Apr 2026

Trusses & roof framing on as well as the barge board iron.

17 Mar 2026

The hard work in preparing the foundations for number 3 & 4 done and concrete floor poured.  Yay.

27 Feb 2026

Framing up on two, roof trusses ready & waiting.

10 Feb 2026

Concrete poured last week & boxing now off.

30 Jan 2026

Crikey, over a ton of reinforcing bars and mesh are in each slab.

15 Jan 2026

Work is continuing, polythene down and look at all that polystyrene insulation.

12 Dec 2025

The first two have started, foundations dug out, shutters up, gravel & crusher dust in along with plumbing.